Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 27 results ...

Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia, Unpublished PhD Thesis, , Brunel University.

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis, Unpublished PhD Thesis, , Brunel University.

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials, Unpublished PhD Thesis, , Brunel University.

Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities, Unpublished PhD Thesis, Business School, Brunel University.

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects, Unpublished PhD Thesis, , Brunel University.

  • Type: Thesis
  • Keywords: developing countries; scheduling; interview; experiment; heuristic; Egypt
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/301441954
  • Abstract:
    After more than two decades of applying CPM as a planning and scheduling technique, recommended by a large number of researchers and backed by wide publicity, there is a growing doubt about CPM's ability to achieve some of the advantages attributed to its application at the beginning. There is a growing awareness of the CPM application problems. These problems are causing its application to be discarded in some small and large companies and limiting its use to the cases where required by clients. Some of the planners and schedulers, whom the researcher met through the survey interviews, had become totally unconvinced by any of the available planning and scheduling techniques. They discarded CPM or limited its application to a few projects when they had to and began to depend on their own experience. They used bar charts only as a method of presenting the developed schedules. The researcher has developed a new planning and scheduling model in which he tried to satisfy some requirements outlined in chapters two and four. The developed model offers different degrees of depth and scope, which satisfy all the different needs in the different project stages. The model uses the heuristic scheduling approach and classifies scheduling cases using two new criteria; the tightness degrees of completion due-dates and resource tightness degrees. The model and the associated heuristic scheduling rules proved throughout the scheduling experiments, to be practical, applicable, flexible and efficient. The researcher found no evidence for the need to introduce major modifications in the logical structure of the developed model to make it applicable and acceptable for construction companies in Egypt and other developing countries. With more training for responsible planners and schedulers and close follow up of the model implementation, especially in the early stages, the model could be efficient and applicable for these companies.

Almutairi, A M S (2017) Protecting the rights of temporary foreign 'low-skilled' workers in the Saudi construction industry: a case for legal reform, Unpublished PhD Thesis, Department of Politics, History and Law, Brunel University.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK, Unpublished PhD Thesis, , Brunel University.

Clark, G G (1993) Rule-based integrated building management systems, Unpublished PhD Thesis, , Brunel University.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Jashapara, A (1995) Learning in organizations: A study of the UK construction industry, Unpublished PhD Thesis, Henley Management College, Brunel University.

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment, Unpublished PhD Thesis, , Brunel University.

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD, Unpublished PhD Thesis, , Brunel University.

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Nathan, P (1991) Project planning and control systems: An investigation into their application and implications of usage in the UK construction industry, Unpublished PhD Thesis, , Brunel University.

Paling, D R (1982) Industrial relations in the building, civil engineering and engineering construction industries, Unpublished PhD Thesis, , Brunel University.

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Sawacha, E O-O (1993) An investigation into safety attitudes and safety performance in the construction industry, Unpublished PhD Thesis, Department of Mechanical Engineering, Brunel University.

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry, Unpublished PhD Thesis, , Brunel University.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application, Unpublished PhD Thesis, , Brunel University.